China Good quality Theme Park Wooden Type Diesel Rail Train with 120 Seats Ty02-7c-120W near me manufacturer

Product Description

1.Feature and advantage:

Theme Park  Mini Track Train/ Locomotive with 120 Seats  

Manufacturer for Amusement Rides Mini Diesel  Track Train with High quality & conpetitive price you. Customer is welcome to visit our new showroom and factory located in HangZhou City, China. 

2.Specifications

TY02-7C-120W Transparent-type Sightseeing Mini Train

Gauge: 762/900/1435mm
Marshalling:  locomotive +coal water truck  + carriage*3
Speed: 10km/h
Crew: 40 *3=120
Mat limit slope: 30 per thousand
Restriction curve radius: 30m 
Power: diesel generating set (Cummins) 

2.1 Ambient conditions and vehicle parameters

1) Project location height is not more than 2000 meters above sea level.
2) The air temperature is between -10 and 40 degree.
3) Electronic components must not be activated without dehumidification in relative humidity greater than 95% or condensation.
4) Vehicles should be CZPT to withstand the invasion of wind and sand and the resistance to salt spray
5) Line gauge: 762mm
6) Limiting slope: 30 ‰ (reduction calculations for curves)
7) The radius of the line longitudinal curve is 200m
8) Line minimum curve radius 40m, difficult area 30m
   

              
2.2 Vehicle parameters

1) Grouping: locomotive + coal water truck + passenger car + passenger car + passenger car
2) Overall dimensions: The whole group: 41m (length) x 2.4m (width) x 3.2m (height);
3) Speed: 0-10km/h, large curve, speed uphill 8km/h.
4) Crew: 40*3=120 seats
5) Emergency braking distance: <15m at the highest speed
6) Frame anti-corrosion treatment: zinc-rich primer dual + dual top coat .
7) Power Source: CZPT Diesel Generator 80kw
8) Drive power: 11kw*4
9) Air whistle, continuous cold steam effect
10) Tour Xihu (West Lake) Dis. Voice Interpretation System
11) Steel frame anti-corrosion treatment: epoxy zinc-rich primer + middle coating + top coat 2 degrees
Drive motor: Three-phase variable-frequency motor 11KW*4
12) Power Source: CZPT Diesel Generator 80kw (HangZhou Int.)
13) Speed Control Mode: V-F Frequency Control
14) Voltage: control voltage, lighting voltage: 24V (safety voltage), power voltage AC 380v
15) Braking: Working brake: dynamic braking, DC braking ; Emergency braking: Electropneumatically combined braking (failure of wind braking).
16) Driver seat : Sitting position 2 seats
17) Air compressor: three-phase air compressor (HangZhou)
18) Inverter plc: Delta (ZheJiang )
19) Coach:9.5m*2.4m*3.3m
20) The welding and spraying zinc of the frame:Q235 profile.
21) The roof:FRP shell with solid wood buckle
22) External walls: steel, solid wood (Hong Xuesong) wood oil 8 degrees.
23) Bogie form: calculating the axle weight of 2.5 tons
24) Floor: bamboo flooring overlay vehicle and ship floor leather (pineapple solid wood flooring / other charges)
25) Sitting stool: 40 solid wood
26) Small table board:10 train style (grain effect)
27) Window:14 oak solid wood windows
28) Door :2 oak solid wood
29) Air conditioning: single refrigeration top 3 sets
30) Heating in winter: electric heating 500W x 6
31) Sound 

2.3 Company profile

HangZhou dising technologies Co., Ltd.is located in the east lake new technology development zone in HangZhou, ZheJiang province.It is a professional supplier of tourist attraction, theme park, characteristic town, and commercial block slow rail transit system;Our service covers the whole process of slow rail transit system survey and design, special track vehicle design and so on.
We promise to improve our professional skills and be based on a careful design attitude, a profound understanding of customer needs and a rich experience in project implementation, to provide customers with high quality and reliable products and economic and reasonable projects.

2.4 Products Series

In the years of industry experience, the company created the ZheJiang tenyun steam locomotive replica plate, the Tianya  corner scenic spot in ZheJiang , the HangZhou Yuet square project, the tram, the ZheJiang lling National Agricultural Park sightseeing train, the Xihu (West Lake) Dis. Lu Jia Village sightseeing small train and so on. The main products covers 3 kinds of landscapes:tourism. Sightseeing trains, sightseeing trams and locomotives 3 kinds of landscapes.

1. Electric Train Sets
2. Electric Locomotive
3. Fun Train
4. Sightseeing Mini Train
5. Tram

2.5 Delivery and Shipment

Shipping by sea: Around 4 weeks to arrive.
Delivery Time: Around 30 working days after receipt of deposit.
MOQ: 1 set.
Payment Term:  30% T/T deposit, 70% T/T before delivery.

2.6 Warranty and post service 

Mini Electric Trackless Train for Tourist: 1 year full warranty,offer FREE components under EXW shipped term.
oversea engineer aftre sale service available

2.7 FAQ

Q1. What is your terms of packing?

A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?

A: T/T 30% as deposit, and 70% before delivery. We’ll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?

A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?

A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?

A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?

A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?

A:1. We keep good quality and competitive price to ensure our customers benefit ;

2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

The 5 components of an axle, their function and installation

If you’re considering replacing an axle in your vehicle, you should first understand what it is. It is the component that transmits electricity from 1 part to another. Unlike a fixed steering wheel, the axles are movable. The following article will discuss the 5 components of the half shaft, their function and installation. Hopefully you were able to identify the correct axle for your vehicle. Here are some common problems you may encounter along the way.
Driveshaft

five components

The 5 components of the shaft are flange, bearing surface, spline teeth, spline pitch and pressure angle. The higher the number of splines, the stronger the shaft. The maximum stress that the shaft can withstand increases with the number of spline teeth and spline pitch. The diameter of the shaft times the cube of the pressure angle and spline pitch determines the maximum stress the shaft can withstand. For extreme load applications, use axles made from SAE 4340 and SAE 1550 materials. In addition to these 2 criteria, spline rolling produces a finer grain structure in the material. Cutting the splines reduces the strength of the shaft by 30% and increases stress.
The asymmetric length of the shaft implies different torsional stiffness. A longer shaft, usually the driver’s side, can handle more twist angles before breaking. When the long axis is intact, the short axis usually fails, but this does not always happen. Some vehicles have short axles that permanently break, causing the same failure rate for both. It would be ideal if both shafts were the same length, they would share the same load.
In addition to the spline pitch, the diameter of the shaft spline is another important factor. The small diameter of a spline is the radius at which it resists twisting. Therefore, the splines must be able to absorb shock loads and shocks while returning to their original shape. To achieve these goals, the spline pitch should be 30 teeth or less, which is standard on Chrysler 8.75-inch and GM 12-bolt axles. However, a Ford 8.8-inch axle may have 28 or 31 tooth splines.
In addition to the CV joints, the axles also include CV joints, which are located on each end of the axle. ACV joints, also known as CV joints, use a special type of bearing called a pinion. This is a nut that meshes with the side gear to ensure proper shaft alignment. If you notice a discrepancy, take your car to a shop and have it repaired immediately.

Function

Axles play several important roles in a vehicle. It transfers power from the transmission to the rear differential gearbox and the wheels. The shaft is usually made of steel with cardan joints at both ends. Shaft Shafts can be stationary or rotating. They are all creatures that can transmit electricity and loads. Here are some of their functions. Read on to learn more about axles. Some of their most important features are listed below.
The rear axle supports the weight of the vehicle and is connected to the front axle through the axle. The rear axle is suspended from the body, frame and axle housing, usually spring loaded, to cushion the vehicle. The driveshaft, also called the propshaft, is located between the rear wheels and the differential. It transfers power from the differential to the drive wheels.
The shaft is made of mild steel or alloy steel. The latter is stronger, more corrosion-resistant and suitable for special environments. Forged for large diameter shafts. The cross section of the shaft is circular. While they don’t transmit torque, they do transmit bending moment. This allows the drive train to rotate. If you’re looking for new axles, it’s worth learning more about how they work.
The shaft consists of 3 distinct parts: the main shaft and the hub. The front axle assembly has a main shaft, while the rear axle is fully floating. Axles are usually made of chrome molybdenum steel. The alloy’s chromium content helps the axle maintain its tensile strength even under extreme conditions. These parts are welded into the axle housing.
Driveshaft

Material

The material used to make the axle depends on the purpose of the vehicle. For example, overload shafts are usually made of SAE 4340 or 1550 steel. These steels are high strength low alloy alloys that are resistant to bending and buckling. Chromium alloys, for example, are made from steel and have chromium and molybdenum added to increase their toughness and durability.
The major diameter of the shaft is measured at the tip of the spline teeth, while the minor diameter is measured at the bottom of the groove between the teeth. These 2 diameters must match, otherwise the half shaft will not work properly. It is important to understand that the brittleness of the material should not exceed what is required to withstand normal torque and twisting, otherwise it will become unstable. The material used to make the axles should be strong enough to carry the weight of a heavy truck, but must also be able to withstand torque while still being malleable.
Typically, the shaft is case hardened using an induction process. Heat is applied to the surface of the steel to form martensite and austenite. The shell-core interface transitions from compression to tension, and the peak stress level depends on the process variables used, including heating time, residence time, and hardenability of the steel. Some common materials used for axles are listed below. If you’re not sure which material is best for your axle, consider the following guide.
The axle is the main component of the axle and transmits the transmission motion to the wheels. In addition, they regulate the drive between the rear hub and the differential sun gear. The axle is supported by axle bearings and guided to the path the wheels need to follow. Therefore, they require proper materials, processing techniques and thorough inspection methods to ensure lasting performance. You can start by selecting the material for the shaft.
Choosing the right alloy for the axle is critical. You will want to find an alloy with a low carbon content so it can harden to the desired level. This is an important consideration because the hardenability of the alloy is important to the durability and fatigue life of the axle. By choosing the right alloy, you will be able to minimize these problems and improve the performance of your axle. If you have no other choice, you can always choose an alloy with a higher carbon content, but it will cost you more money.
Driveshaft

Install

The process of installing a new shaft is simple. Just loosen the axle nut and remove the set bolt. You may need to tap a few times to get a good seal. After installation, check the shaft at the points marked “A” and “D” to make sure it is in the correct position. Then, press the “F” points on the shaft flange until the points are within 0.002″ of the runout.
Before attempting to install the shaft, check the bearings to make sure they are aligned. Some bearings may have backlash. To determine the amount of differential clearance, use a screwdriver or clamp lever to check. Unless it’s caused by a loose differential case hub, there shouldn’t be any play in the axle bearings. You may need to replace the differential case if the axles are not mounted tightly. Thread adjusters are an option for adjusting drive gear runout. Make sure the dial indicator is mounted on the lead stud and loaded so that the plunger is at right angles to the drive gear.
To install the axle, lift the vehicle with a jack or crane. The safety bracket should be installed under the frame rails. If the vehicle is on a jack, the rear axle should be in the rebound position to ensure working clearance. Label the drive shaft assemblies and reinstall them in their original positions. Once everything is back in place, use a 2-jaw puller to pry the yoke and flange off the shaft.
If you’ve never installed a half shaft before, be sure to read these simple steps to get it right. First, check the bearing surfaces to make sure they are clean and undamaged. Replace them if they look battered or dented. Next, remove the seal attached to the bushing hole. Make sure the shaft is installed correctly and the bearing surfaces are level. After completing the installation process, you may need to replace the bearing seals.

China Good quality Theme Park Wooden Type Diesel Rail Train with 120 Seats Ty02-7c-120W   near me manufacturer China Good quality Theme Park Wooden Type Diesel Rail Train with 120 Seats Ty02-7c-120W   near me manufacturer